Ankara–Konya high-speed railway
Ankara–Konya high-speed railway | |
---|---|
An HT65000 EMU set in Konya
|
|
Overview | |
Type | High-speed rail |
System | Turkish State Railways |
Status | Operational |
Locale | Central Anatolia |
Termini | Ankara Konya |
Stations | 3 |
Operation | |
Opened | August 23, 2011 |
Owner | Turkish State Railways |
Operator(s) | Turkish State Railways |
Depot(s) | Güvercinlik Yard New Etimesgut Yard Future |
Rolling stock | HT65000, HT80000 |
Technical | |
Line length | 212 km (131.73 mi) (From Polatlı to Konya)[1] |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Minimum radius | 3 500 m |
Operating speed | 250 km/h (160 mph)[2] |
Maximum incline | 16 ‰ |
The Ankara–Konya high-speed railway (Turkish: Ankara–Konya yüksek hızlı demiryolu) is a high-speed rail line between Ankara and Konya. Yüksek Hızlı Tren (YHT) started commercial operations on 23 August 2011.[3] Built at a cost of about TL1 billion, the line is the second high-speed rail line in Turkey, after the Ankara–Istanbul high-speed railway.[4] The line shares the same route with the İstanbul–Ankara high-speed railway from Ankara to Polatlı, from where it branches south at the large Polatlı high-speed rail junction. From Polatlı the line continues south through the plains of middle Anatolia and joins the old Eskişehir–Afyon–Konya railway at Sarıcalar, just north of Konya and continues in parallel to the city.
Construction started on 8 July 2006 and was finished in mid-2011. Test runs started on 3 June 2011 and the commercial runs started on 23 August. It was a turn-key project and constructed by Yapı Merkezi.
Gallery
See also
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
<templatestyles src="Asbox/styles.css"></templatestyles>
<templatestyles src="Asbox/styles.css"></templatestyles>
- ↑ http://tr.railturkey.org/2015/06/10/konya-polatli-yuksek-hizli-tren-hatti/
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Pages with reference errors
- Articles that mention track gauge 1435 mm
- Articles containing Turkish-language text
- Turkey articles missing geocoordinate data
- Ankara Province
- Konya Province
- High-speed railway lines in Turkey
- Railway lines opened in 2011
- Standard gauge railways in Turkey
- Asia rail transport stubs
- Turkey transport stubs