Lanzhou–Zhongchuan Airport Intercity Railway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Lanzhou-Zhongchuan Airport Intercity Railway
兰州至中川机场铁路
ChinaRailwayHighspeed.svg
Overview
Type High-speed rail
Status Operational
Locale China
Termini Lanzhou
Lanzhou Zhongchuan Airport
Stations 6
Operation
Opened September 30th, 2015
Operator(s) China Railway High-speed
Technical
Line length 61 km (38 mi)
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius 3,500 m (11,483 ft)
Operating speed 250 km/h (155 mph)
Maximum incline 6.0%
Lanzhou Zhongchuan Airport

Intercity Railway route map

 Lanzhou-Zhangye Intercity Railway to Zhangye 
Zhongchuan Airport
Lanzhou New Area
Yellow River
 Lanzhou-Xinjiang Railway to Urumqi 
Xigu
 Lanzhou-Xinjiang High-Speed Railway to Xining 
Fuliqu
ChenguanyingLanzhou Metro Line 1
Lanzhou WestLanzhou Metro Line 2
 Baotou–Lanzhou Railway & Xuzhou-Lanzhou HSR to Lanzhou 

Lanzhou Zhongchuan Airport Intercity Railway is a high-speed railway in China, located in Gansu Province, connecting the Lanzhou urban area and Lanzhou Zhongchuan Airport. The Lanzhou Zhongchuan International Airport is quite distant from the actual city area of Lanzhou itself. Regular ground transport currently takes about an hour to make the journey and taxi journeys are expensive at around 150 to 200RMB, but with little to no time advantage over the airport bus service. Thus a high-speed rail connection was initiated by the Lanzhou government in order to improve access to the airport, but also to the adjacent Lanzhou New Area special economic zone. The journey to the airport now takes from 30 to 40 minutes at a cost of 18.5RMB for Second Class and 22RMB for First Class.

Overview

The Lanzhou Zhongchuan Airport Intercity Railway is proposed to be the first section of a longer Lanzhou-Zhangye Intercity Railway, connecting western Gansu cities. Length of the railway will be 61 km. Starting from Lanzhou West Railway Station to Fuliqu, the route will parallel the Lanzhou–Xinjiang High-Speed Railway. From Fuliqu to Zhongchuan Airport will have 48.2 km of new railway, built as a double tracked electrified line. Total investment will be over 9.1 billion yuan RMB. A total of six stations will be constructed, Lanzhou West Railway Station will allow transfers to the future Lanzhou Metro Line 2, Chenguanying will allow transfers to Metro Line 1.

An initial groundbreaking ceremony was held on December 27, 2010. However works were not actually started. On December 21, 2012, another groundbreaking ceremony was held again with full construction now underway.[1] The line started operation on 30 September 2015.[2]

References

  1. 敦煌至格尔木和兰州至中川机场铁路开工建设 (Work started on the Dunhuang-Golmud Railway and on the railway from Lanzhou to Zhongchuan Airport), 2012-12-23
  2. Lua error in package.lua at line 80: module 'strict' not found.