Zhengzhou–Jiaozuo Intercity Railway
Zhengzhou–Jiaozuo Intercity Railway | |
---|---|
![]() |
|
Overview | |
Native name | 鄭焦城際鐵路 |
Type | High-speed rail |
Status | Operational |
Locale | Henan, People's Republic of China |
Termini | Zhengzhou Jiaozuo |
Stations | 7 |
Operation | |
Opened | June 26, 2015 |
Operator(s) | China Railway High-speed |
Technical | |
Line length | 77.786 km (48 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Operating speed | 200 km/h (124 mph) |
Zhengzhou-Jiaozuo Intercity Railway | |||||||
Simplified Chinese | 鄭焦城際鐵路 | ||||||
---|---|---|---|---|---|---|---|
Traditional Chinese | 鄭焦城際鐵路 | ||||||
|
Zhengzhou–Jiaozuo Intercity Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Zhengzhou–Jiaozuo Intercity Railway is one of 14 lines operating, under construction or planned around Zhengzhou, Henan province, China. It links Zhengzhou with the city of Jiaozuo. Construction was started on December 29, 2009, and was completed by April 5, 2015. Testing commenced in May 2015[1] before being officially opened on June 26, 2015.[2] Total journey time between the two terminii is 40 minutes.[3] It is 77.786 km (48 mi) long, of which 9.648 km (6 mi) is shared with the Beijing-Guangzhou High Speed Railway and 68.138 km (42 mi) of new trackage. It was jointly funded by the Henan Provincial Government and the now defunct Ministry of Railways.
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
<templatestyles src="Asbox/styles.css"></templatestyles>
- Pages with reference errors
- Articles that mention track gauge 1435 mm
- Articles containing simplified Chinese-language text
- Articles containing traditional Chinese-language text
- Pages with broken file links
- Use dmy dates from December 2015
- Unclassified articles missing geocoordinate data
- High-speed railway lines in China
- Standard gauge railways in China
- Rail transport in Henan
- Zhengzhou
- Jiaozuo
- Railway lines opened in 2015
- People's Republic of China rail transport stubs