Lori 1 Wind Farm

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Lori 1 Wind Farm
Wind Power in Armenia at Pushkin Pass.jpg
The Lori 1 Wind Power plant at Pushkin Pass
Location of Lori 1 Wind Farm in Armenia
Location Lori Province
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Status Operational
Commission date 2005
Construction cost US$3.2 million
Owner(s) High-Voltage Electric Networks of Armenia
Wind farm
Type Onshore
Power generation
Units operational 4 x 660 kW
Nameplate capacity 2.6 MW
Planned: 90 MW

Lori 1 Wind Farm is a wind farm located along the Bazum Mountains at Pushkin Pass in Lori, Armenia. It is the country's only wind farm. The wind farm consists of four 660-kW wind turbines and has a capacity of 2.64 MWe.[1][2] Completed in December 2005 by the Iranian company Sunir with US$3.2 million funding from Iran, it is owned by the High-Voltage Electric Networks of Armenia.[1] In 2006, the Lori 1 generated only 2.6 GWh of electricity (a yearly average of 296.8 KWe—about 11% of installed capacity).[3]

The Armenian and Iranian authorities have agreed to expand the wind farm up to 90 MW.[4]

References

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />


<templatestyles src="Asbox/styles.css"></templatestyles>

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. PSRC-Q42006-Energy-Main-Indicators, Public Services Regulatory Commission of The Republic of Armenia, 2007.]
  4. Iran-Armenia Wind Farm