Penly Nuclear Power Plant
Penly Nuclear Power Plant | |
---|---|
File:Penly nuclear power plant and villages around - aerial view.JPG | |
Location of Penly Nuclear Power Plant in France
|
|
Official name | Centrale Nucléaire de Penly |
Country | France |
Location | Dieppe, Seine-Maritime |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Construction began | 1982 |
Commission date | 4 May 1990 |
Operator(s) | EDF |
Nuclear power station | |
Reactor type | PWR |
Reactor supplier | Framatome |
Cooling source | English Channel |
Cooling towers | no |
Power generation | |
Units operational | 2 x 1,382 MW |
Make and model | Alstom |
Units planned | 1 x 1,650 MW |
Nameplate capacity | 2,764 MW |
Annual generation | 19,418 GWh |
Website Site c/o Betreibers |
The Penly Nuclear power station (French: Centrale nucléaire de Penly) is found some 6 miles (9.7 km) northeast of Dieppe. It lies on the border of two French municipalities: Penly and Saint-Martin-en-Campagne in the département of Seine-Maritime, Normandy, on the English Channel coast. It employs France's only working funicular railway in industrial use.
Data
The plant employs about 670 people full-time and is owned and operated by the French company Électricité de France (EDF). Water from the English Channel is used for cooling.
The two PWR units are of the 1330 MWe class. The installed total output is 2764 MW, which means the plant is about average for French nuclear plants. It feeds on average about 18 billion kilowatt-hours per year into the public grid, corresponding to about 80% of the current annual consumption of Normandy. It is about ten kilometres from Dieppe.
Proposed third reactor
In January 2009, the French government announced that a third reactor, the second French EPR reactor, would be built in Penly. Construction was announced for 2012 with connection to the grid following in 2017. GDF Suez was to own a part of the plant, with the majority taken by EdF.[1] However in 2010 GDF Suez withdrew from the project.[2] In 2011, following the Fukushima Daiichi nuclear disaster, EdF postponed public consultations putting in doubt the 2012 construction start date.[3] In 2013, it confirmed there was no start plan for Penly, saying that current demand did not warrant it.[4]
Accidents and incidents
9 June 2004 - Weakly radioactive water was leaked into the sea from the reserve tank of a reactor's secondary circuit.[5]
11 October 2011 - A subcontractor employee had localised contamination on his face.[6]
5 April 2012 - 10 Fire engines attended a small fire within a reactor building. The operating company later reported two small oil fires inside the reactor building from a leaking oil pipe were extinguished with nobody hurt and no environmental impact. The detection of smoke caused the reactor to be automatically shut down.[7][8]
6 April 2012 - As a consequence of the incident of 5 April 2012 a joint had leaked radioactive water into collection tanks inside the reactor building.[9] The incident was classified as 1 out of 7 (lowest) on the International Nuclear Event Scale.[10]
References
<templatestyles src="Reflist/styles.css" />
Cite error: Invalid <references>
tag; parameter "group" is allowed only.
<references />
, or <references group="..." />
External links
- Site officiel de la centrale de Penly
- Commission particulière du débat public - Penly 3
- La construction d'un deuxième réacteur nucléaire EPR fait polémique
Wikimedia Commons has media related to Penly nuclear power plant. |
- ↑ New French nuclear to include oil interest
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ http://www.bfmtv.com/economie/pas-depr-a-centrale-penly-439064.html
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- Pages with reference errors
- Use dmy dates from January 2013
- Pages with broken file links
- Articles containing French-language text
- Articles with French-language external links
- Commons category link is locally defined
- Nuclear power stations in France
- Buildings and structures in Seine-Maritime
- Nuclear power stations with proposed reactors
- Électricité de France