Beijing–Shenyang High-Speed Railway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Beijing–Harbin
High-Speed Railway
Beijing–Shenyang Section
京哈高速铁路京沈段
ChinaRailwayHighspeed.svg
Overview
Type CRH
Locale China
Operation
Owner China Railway
Operator(s) China Railway High-speed
Depot(s) Shenyang, Harbin
Rolling stock TBD: CRH5 series
Technical
Track gauge 1,435 mm (4 ft 8 12 in)
Route map
Beijing-Shenyang Railroad.svg
Beijing–Harbin High-Speed Railway

Beijing–Shenyang Section
京哈高速铁路京沈段

Beijing Underground Cross City Railway
to Beijing West
Beijing
Beijing–Shanghai HSR
to Shanghai
Xinghuo
Shuangsha Railway
to Shahe
Shunyi West
Huairou
Miyun East
Xinlong West
Changde South
Pingquan North
Lingyuan South
Kazuo
Chaoyang North
Beipiao East
Fuxin North
Heishan North
Xinmin North
Shenyang North-West Bypass
New Shenyang North Shenyang South-West Bypass
Shenyang North
Harbin-Dalian HSR
to Harbin West
Shenyang
Shenyang South-West Bypass
Shenyang South
Shenyang-Dandong ICR
to Dandong
Harbin-Dalian HSR
to Dalian

Beijing–Shenyang High-Speed Railway is a high-speed rail line under construction between Beijing and Shenyang cities in China. The line is 705 kilometres long. Construction was supposed to have started in 2010 with the project to be completed in 2012 but was delayed repeatedly until March 2014.[1][2]

Protests by residents along the planned route have caused several safety review to examine the potential noise pollution and electro-magnetic radiation.[3][4] The first two reviews suggested installing noise shielding along sensitive parts of the line. The third review called for similar noise shielding in addition to above ground tunnels to completely enclose the line while near urban areas.[5] In addition the starting point has been relocated to Xinghuo in Chaoyang district of Beijing. In August 2013, the Beijing municipal government published a notice calling for bids to build the line and work is expected to begin shortly with a planned completion sometime in the year 2018. The total investment is expected to be 124.5 billion yuan.[6][7]

The line will relieve a significant bottleneck in China's transportation network between the North East region and Beijing. The route will be north and inland of the existing communication lines which hug the coast around the Bohai sea. The new line will leave Beijing heading northeast to Chengde in Hebei province then turn east through Chaoyang, and Fuxi in Liaoning province, on route to Shenyang. There will be 16 stations, which will be the last section of the Beijing–Harbin Passenger Dedicated Line to be completed; the other sections of that line have been operational since December 1, 2012.

The line will have a maximum design speed of 350 km/h[8] though regular services will operate around 200 to 300 km/h. Travel time between Shenyang and Beijing will be cut from the current 4 hours to just 2 hours and 17 minutes.[9]

See also

References

<templatestyles src="Reflist/styles.css" />

Cite error: Invalid <references> tag; parameter "group" is allowed only.

Use <references />, or <references group="..." />

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.