CGR 0-4-0ST 1873

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
CGR 0-4-0ST 1873
300px
Cape Government Railways 0-4-0ST of 1873,
no. M2 Little Bess
Type and origin
Power type Steam
Designer Manning Wardle & Company
Builder Manning Wardle & Company
Serial number 434, 442 & 494
Build date 1873-1874
Specifications
Configuration 0-4-0ST (Four-coupled)
Driver axle 2nd coupled axle
Gauge 3 ft 6 in (1,067 mm) Cape gauge
Coupled dia Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value).
Wheelbase 4 ft 9 in (1,448 mm)
Length:
 • Over couplers
18 ft 7 in (5,664 mm)
Height Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value). chimney
10 ft (3,048 mm) cab roof
Adhesive weight Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Loco weight Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value). w/o
Fuel type Coal
Fuel capacity 5 long hundredweight (0.25 t)
Water cap Lua error in Module:Convert at line 1851: attempt to index local 'en_value' (a nil value).
Boiler:
 • Pitch
3 ft 10 in (1,168 mm)
 • Tube plates 7 ft 3 in (2,210 mm)
 • Firebox type Round-top
Boiler pressure 130 psi (896 kPa)
Firegrate area 4.5 sq ft (0.42 m2)
Heating surface 246.5 sq ft (22.90 m2)
 • Tubes 217.5 sq ft (20.21 m2)
 • Firebox 29 sq ft (2.7 m2)
Cylinders Two
Cylinder size 9 in (229 mm) bore
14 in (356 mm) stroke
Valve gear Stephenson
Couplers Bell link-and-pin
Performance figures
Tractive effort 3,280 lbf (14.6 kN) @ 75%
Career
Operators Mac Donald & Company
Cape Government Railways
Number in class 3
Numbers M1-M2, W46
Official name Pioneer & Little Bess (M1 & M2)
Delivered 1873-1874
First run 1873

The Cape Government Railways 0-4-0ST of 1873 was a South African steam locomotive from the pre-Union era in the Cape of Good Hope.

In 1873, two Cape gauge saddle-tank locomotives with a 0-4-0 wheel arrangement were placed in construction service by Mac Donald & Company, contractors to the Port Elizabeth and Uitenhage Railway Company. When the contract was completed in 1875, the railway and the locomotives were taken over by the Midland System of the Cape Government Railways. A third locomotive, built to the same design, was delivered to the Western system in Cape Town in 1874. These were the first Cape gauge locomotives to enter service in South Africa.[1][2][3][4]

Cape railways expansion

When the control of railways in the Cape of Good Hope was taken over by the Colonial Government on 1 January 1873, and the Cape Government Railways (CGR) was established with the object of railways expansion, a Select Committee was appointed to study the question of track gauge. The choice which had to be made, was between the existing Standard gauge of Lua error in Module:Convert at line 452: attempt to index field 'titles' (a nil value). and the narrower gauge of 2 feet 6 inches (762 millimetres), which would effect savings of up to one-third on construction cost.[5][6]

The narrow gauge had been proposed by civil engineer R. Thomas Hall, Superintendent of the narrow gauge Redruth and Chacewater Railway in Cornwall, who was involved in the construction, beginning in 1869, of the Namaqualand Railway line, which was being built to that gauge between Port Nolloth and O'okiep for the Cape Copper Mining Company. The committee, with a three-to-one vote, settled on a compromise between the two recommended gauges and the 3 feet 6 inches (1,067 millimetres) Cape gauge came into existence in Africa.[5][6]

Manufacturer

The first three locomotives for the new Cape gauge lines were built by Manning Wardle & Company in 1873 and 1874. The first two, ex works on 12 March and 3 May 1873 respectively, were delivered in 1873 to Mac Donald & Company, contractors to the Port Elizabeth and Uitenhage Railway Company in Port Elizabeth. The contractors named them Pioneer and Little Bess respectively.[1][2][3][4][7][8]

The third locomotive, ex works on 6 February 1874, was delivered to the Western system in Cape Town in 1874 and was numbered W46 in the Western's number range.[2]

Cape Midland System

By 1872, Port Elizabeth already possessed extensive Standard gauge trackage between the harbour and Swartkops, but trains were still animal-hauled. Work by contractors Mac Donald & Company on railway expansion from Port Elizabeth into the interior commenced in June 1872. The two locomotives which were delivered to them in 1873, were utilised as construction engines.[4][5][7][8]

The first train ran as far as Sydenham in October 1873, and 11 miles (18 kilometres) of railway was completed by 1874. When the two new lines were opened in 1875, northwestward to Uitenhage and northward from Swartkops to Barkly Bridge, the lines and the construction locomotives were taken over by the CGR and the locomotives were numbered M1 and M2 for the Midland System. These two locomotives, together with a smaller 0-4-0ST named Mliss, which joined them on construction work in 1874, are considered the pioneers of locomotives over the greater part of the Midland System.[4][5][7][8]

Cape Western System

By 1874, when no. W46, the third of the first three locomotives, was delivered to the Western System, construction work was proceeding in two directions from Wellington. New Cape gauge track was being laid deeper into the interior towards Worcester, while track dual-gauging was being undertaken back from Wellington towards Cape Town.[5]

References

  1. 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 4.2 4.3 Pioneer, Little Bess & Mliss
  5. 5.0 5.1 5.2 5.3 5.4 Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 7.2 Lua error in package.lua at line 80: module 'strict' not found.
  8. 8.0 8.1 8.2 Sellick (1904) p. 145